Wednesday, July 23, 2014

29A-10 right panel installation

If you look really closely, you’ll see two screw heads in the back of the map box.  It was a bit of a challenge to get both arms into position so that I could attach the hardware.  I also had to drill from beneath the instrument panel through two pre-placed holes.  I missed one by about 1 cm, so there’s an extra hole down there.

The exciting part about this installation is that I’m only 1 step away from finishing the fuselage kit!

IMG 3468

Map Box installed in Right panel

 

No comments: